Close Menu
followict
    Facebook X (Twitter) Instagram
    Sunday, September 6
    Facebook X (Twitter) Instagram
    followict
    • Home
    • News
    • Reports
    • Interviews
    • Smart City
    • Startups
    • Fintech
    • العربية
    followict
    Homepage » Modon Developments Injects EGP 10 Billion to Accelerate Construction at Boutique Village in New Cairo
    Smart City

    Modon Developments Injects EGP 10 Billion to Accelerate Construction at Boutique Village in New Cairo

    Basant ElnegmyBy Basant Elnegmy6 September، 2026
    Facebook Twitter Pinterest LinkedIn Tumblr Email
    وتيك فيليج – Boutique Village
    وتيك فيليج – Boutique Village
    Share
    Facebook Twitter LinkedIn Pinterest Email

    As part of its ambitious expansion strategy in the heart of New Cairo, Modon Developments has revealed major construction and investment details for its mixed-use Boutique Village project, located in the Golden Square area.

     

    The move reflects the company’s commitment to accelerating construction works and injecting substantial liquidity to ensure that units are delivered according to the scheduled timelines.

     

    Record Investment Injection and Year-End Targets

     

    The company revealed that the total investment allocated to Boutique Village amounts to EGP 15 billion. To accelerate construction progress on the ground, Modon Developments plans to inject approximately EGP 10 billion of the allocated investments by the end of the current year, alongside intensifying construction activities.

     

    65% Completion of Phase One and Operations Set for June

     

    Construction works on the project’s first phase are progressing steadily, with the actual completion rate reaching approximately 65% to date. Construction activities, along with internal and external finishing works, are continuing in line with the approved timetable.

     

    According to the company’s schedule, the majority of construction works for the first phase are expected to be completed before the end of the current year. The remaining finishing works and technical preparations will be completed during the first months of next year, paving the way for the start of unit handovers and the project’s actual operations in June 2027, with completed components set to become operational immediately upon handover.

     

    Integrated Development Plan and Diverse Service Offering

     

    Boutique Village spans a total area divided into two phases. The first phase covers approximately 17,500 square meters, while the second phase extends over an area of up to 25,000 square meters.

     

    The project features a distinctive architectural design combining residential, commercial, and administrative activities. Buildings within the development consist of a basement level, a ground floor, four repeated upper floors, and a rooftop.

     

    The project also includes a dedicated commercial and administrative mall designed to serve entrepreneurs and brands under the name Boutique Business Village.

     

    Strong Sales Demand and Launch of Phase Two

     

    Amid the project’s rapid construction progress, Boutique Village has witnessed strong investment demand. The company revealed that the majority of residential units across three residential buildings have been sold.

     

    The three buildings comprise a total of 160 residential units, including 60 units in each of two main buildings and 40 units in the third building. Some of the project’s commercial components have also recorded a 100% sales rate.

     

    Meanwhile, the company confirmed the commencement of actual works on the project’s second phase, including excavation, site preparation, and initial construction preparations.

     

    Modon Developments has set an ambitious construction plan targeting the full completion of the project within the next 18 months.

    The short URL of the present article is: https://followict.news/nf74
    Boutique Business Village Boutique Village Boutique Village construction progress Boutique Village Egypt Boutique Village New Cairo Boutique Village Phase 1 Boutique Village Phase 2 Boutique Village project EGP 10 billion investments EGP 15 billion investment Egypt real estate Egypt real estate investments Egypt real estate market Fifth Settlement real estate Golden Square New Cairo Golden Square real estate Modon Boutique Village Modon Developments Modon Developments Egypt Modon Developments investments Modon Real Estate New Cairo Real Estate real estate investments in Egypt
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email

    Related Posts

    EGP 5 Billion Investment: Modon Developments Completes 52% of Green River Tower, Delivery Set Within 8 Months

    6 September، 2026

    EGP 16.5 Billion in Investments: Modon Developments Unveils Major Expansion Plan Across East and West Cairo

    6 September، 2026

    Aqar Exit Launches Egypt’s First Property Assignment Market Index, Valuing Listed Units at EGP 72.2 Billion

    6 September، 2026
    شاهد الان
    أحدث النشرات الإخبارية
    • من ممر للبيانات إلى قوة رقمية.. مصر في قلب سباق التكنولوجيا بين واشنطن وبكين !
    • «الهوية المالية الرقمية».. «المركزي» يُسقط  الجدار الأخير أمام اكتمال الصيرفة اللاتلامسية في مصر
    • من التمويل إلى النفوذ.. هل يُعيد المهرجان العالمي لريادة الأعمال تموضع مصر في القطاع إقليمياً؟
    • فوضى تسجيل خطوط المحمول.. عشوائية الماضي هل تُهدد الهوية الرقمية في المستقبل؟
    • «المنظومة الرقمية للمصنعين».. إعادة تشكيل بيئة الاستثمار الصناعي بين قوة التكنولوجيا وتحديات التطبيق

    موقع إلكتروني ومنصة إعلامية متخصصة في الاقتصاد الرقمي، لتغطية الجوانب التكنولوجية بمختلف القطاعات الاقتصادية.
    يصدر الموقع عن شركة اف او دابليو للمحتوى الإلكتروني والدعاية والإعلان وتنظيم المؤتمرات (شركة ذات مسئولية محدودة).
    وتعد منصة FollowICT هي بوابة الاقتصاد الرقمي الأولى في الوطن العربي، ونجحت في حصد جائزة الإعلام العربي لعام 2022 كأفضل منصة رقمية متخصصة في......

    • Email: newsletter@followict.com

    Facebook X (Twitter) Pinterest YouTube WhatsApp
    Subscribe now to the newsletter
    Please confirm your subscription!
    Some fields are missing or incorrect!
    © 2026 Solution Academy Designed by Solution Academye.

    Type above and press Enter to search. Press Esc to cancel.